Nutanix Validated Design (NVD) – On-Prem

Nutanix Validated Design – On-Prem  :

The

Nutanix delivers the Hybrid Cloud Validated Design – On Premises, based on the Hybrid Cloud Reference Architecture, as a bundled solution for general server virtualization that includes hardware, software, and services to accelerate and simplify the deployment and implementation process. This Validated Design features a full-stack solution for hybrid cloud deployments that integrates multiple products including AOS, AHV, Prism Pro, Calm, Flow, Leap, Mine, and HYCU.The Hybrid Cloud Validated Design – On Premises sizer reference scenarios have the following features:

 

  • A baseline configuration for each Availability Zone is comprised of three clusters:
    • Management – 4-node cluster based on NX-1175S for Prism Central, Active Directory, IPAM, Load Balancing, SYSLOG, and any other management services.
    • Workload – 4-16 nodes of NX-3170-G8 for general purpose server virtualization workloads.
    • Backup – 4-node cluster of NX-8155-G8 for Mine/Hycu

 

A dedicated management cluster in each Availability Zone provides increased availability, security, operations, and performance. The workload cluster has a defined maximum size of 16 nodes, which provides a reasonable maintenance window for rolling firmware and software upgrades. Smaller workload clusters can be deployed, but the maximum size should not exceed 16 nodes.

 

  •  NVD Defines standard VM “t-shirt” sizes for deployment via Calm:

 

Small Medium Large
1 vCPU 2 vCPU 4 vCPU
8 GB RAM 16 GB RAM 32GB RAM
50GB SSD 100GB SSD 200GB SSD
Max 124 VMs/Node Max 92 VMs/Node Max 46 VMs/Node

 

  • When using the defined VM sizes, the per-workload cluster maximums are:

 

Small VMs Medium VMs Large VMs
Maximum running VMs per workload cluster building block 1,860 1,380 690
Maximum deployed VMs per workload cluster building block to allow for disaster recovery capacity 930 690 345

 

  • Due to quoting limitations, a single Availability Zone has two sizer scenarios: Management + Workload cluster, and Backup Cluster. Note that the Hycu software license is not included, and must be purchased separately via other channels. 
  • Services SKUs are not included in the Sizer reference scenarios. Review the BOM in the NVD appendix for the complete list of Services SKUs which should be included.
  • For a full Disaster Recovery solution, two AZs should be quoted which mirror each other. The design should call for running each workload cluster in the AZ at less than 50% capacity, to enable full fail-over capability for all workloads. 

 

It is extremely important to review the entire <doc name> on the Solutions Support portal to understand the complete Hybrid Cloud validated solution. 

 